Home
Introduction
History
Organization
Photos
Downloads
Links of Interest
Drainage District Map
Utility Consumption
Special Notices
Hurricane Information
Hurricane Track Map
Contact
Disclaimer

 

<Go back      All Photos Page    (Viewing All Categories)

Photo Title / Location Desc Photo
Airport Viterbo Improvements
Port Arthur


Category:
Projects
Improvements to Lateral C-11 giving relief to the upper Airport Viterbo System.
Alligator Bayou P.S. No. 16
Port Arthur


Category:
Pump Facilities
Alligator Bayou P.S. No. 16
Central Ditch - Lower
Port Arthur


Category:
Projects
Installation of the New Central Ditch supplying drainage for the New Hospital Complex in Port Arthur (Medical Center of Southeast Texas)
Central Gardens New Outfall
Nederland


Category:
Projects
Drilling New Outfall for additional relief to Central Gardens
Elvista Improvements
El Vista


Category:
Projects
Improvements to ElVist West Lateral 1
Flooding Hurricane Carla
Groves


Category:
Old Time
Property Flooding Hurricane Carla September 12, 1961
Halbouty Pump Station Facilities
Port Arthur


Category:
Pump Facilities
Halbouty Pump Station No. 20 showing Main "C" Canal, Gates and Retension Facility
Main "C" Phase II - Improvements
Nederland


Category:
Projects
Main "C" Phase III Improvements
Old Salt Water Locks
Port Arthur


Category:
Old Time
Old Salt Water Lock - Located within the Main Outfall System - April 1952
Sea Wall
Port Arthur


Category:
Old Time
Old Hurricane Protection Levee 1948
Snakes
Port Arthur


Category:
Old Time
Photo taken at the end of Port Arthur Pleasure Pier - Hurricane Carla 1961.